Friday, September 3, 2010

The Big Move

Sorry for the delay once again - things just keep getting busier. We have our keys! Floorboard and carpet installation is organised for next Tues and Wed 7th and 8th of Sept, and the big move date is set for Saturday, 11th of Sept.

We have settlement of our current house on the 20th of Sept, which will allow us to get Stormwater, Tiling, AirConditioning Unit installation,  Driveway, Fencing and Blinds organised soon after. We are in a bit of a catch 22 at the moment with waiting for settlement to access money, but needing things ready for when we move in, but needing to move before settlement. We'll get there. We always do.

Only 9 more weeks until little bub is here. Hard to believe how time has flown.

Will update with photos soon.

Friday, July 16, 2010

Rest in Peace

Grandpa - although you will never get to visit inside our house, we will be sure to take many happy memories of you there with us. We love you very  much.

So much has happened over the past month since my last post.
  • Both my Grandpa's were admitted to hospital for aggressive cancers which were only discovered recently. Unfortunately, my dad's dad lost his battle, but he is now at rest without further pain.
  • Little bubs is fighting fit, with the 19 week ultrasound going well. It is kicking all the time and the obstetrician has supported that it will be a very active baby. D will be happy with that.
  • Back at school I completed my AST1 (Advanced Skill Teacher) which is a process that allows for recognition of the strengths and skills I bring to the job.
  • Our current house is still on the market. Seems like the interest is there, people are just being cautious with interest rates hovering, an election coming up and a lower demand in general. We are hoping a couple interested parties who will return again this weekend for an open inspection may actually put pen to paper.
Our beautiful Majestic is now nearing completion. The final fixings, painting, tiling, plumbing are all complete. Our 2nd Electrician is doing the final fix this week, leaving only the clean up to take to place. We have been given a walk through date of the 26th of July and Handover 1st of August. We just need to confirm with our work places for time off in the afternoon for this to happen.

Anyhow, here are some pics...

Beautiful stained front doors
Vandalised front doors (paint tins left in mini-skip)
Front of house (render finished painting, balcony complete)
Electrical Hub (in garage)
Grand Entry
We are now looking forward to the big move and not looking forward to all the extra jobs that need to be organised - carpets, floorboards, driveway, front fence, water tank...Busy Busy Busy... :-)

Monday, June 7, 2010

Lots of Action


Since my last post, there has been lots of action on site
  • all tiling
  • painting
  • installation of powerpoints
  • installation of downlights/heat lamps/outdoor lighting
  • bathroom vanities installed
  • balcony rail put on
Today all hands were on deck, with the Electricians, Plumbers, Tilers, Painters and Site Superviser all there. We have been given an approximate completion date for the end of July, which is exciting news. We will still have carpets, tiling, floor boards to install before moving in, but just knowing and being able to have a rough plan of time frame is wonderful.

We are glad we put our house on the market when we did, it just means having to live immaculately for all the open inspections, so lots of tidying and cleaning all the time. (Part of the reason for such a delay in updates)

So here's the photos...

(Family Room)
(Ensuite 2)
(Main Bedroom Ensuite)
(Ktichen) 

P.S. I go for my 19 week Ultrasound this Friday.

Friday, May 7, 2010

Other news (as promised)

Sorry for the long delay (as mentioned in the last post, we have been busy with preparing to sell the current house we live in). But...with no further ado...


I'm pregnant. Yay! Due 4th November 2010

Front Doors - We love them!

After a busy week, I finally have time to provide an update. Last week our gorgeous front doors were installed. They are yet to be stained, but we love them already!


From the inside
Ceiling speaker holes cut
Another view of the grand stairs

These pictures are actually from over a week ago. Haven't had a chance to go past the house this past week as we are in the process of putting our current house on the market. Our real estate agent came around last night and we signed all the contracts ready for sale. Selling our current house has become a matter of priority with another building invoice received bringing the build to 90% completion. Still looking forward to hearing an approximate building completion date.

Friday, April 23, 2010

Stairs, Kitchen, Roller Doors -Lots of Action :-)

With no work expected other than waterproofing of wet areas, we were greatly suprised during the week to see a great list of additions having taken place.
Kitchen cupboards installed

Gas meter installed
All doors (internal and front entry) delivered
Roller Doors Installed
and...
Grand Entry Staircase Installed



(note in the background you can see the vanities for the upstairs ensuites)

It was such an exciting day to see all this done in one day. Apparently once the waterproofing is complete the tiler will be in. We have emailed the builder asking an approximate completion date because from our point of view, there musn't be a lot left to do.

Oh and one more thing happened during the last week too, which I will share over the weekend when I get time, so don't forget to check back soon :-)

P.S. All internal photos were taken through dirty windows so sorry if there is glare or it looks like poor quality.

Monday, April 12, 2010

Gyprocking

Gyprocking now looks complete. We're guessing the next stage is to pull the electrical wires through. Although it makes it feel so much more like a house and really defines each room, we've just posted one photo as all the photos look so much the same.

(Taken from the kitchen area overlooking dining and family rooms)

Sunday, April 4, 2010

Insulation

Last Wednesday 31-3-10, we had a walk through to check all the electrical work had been completed. Although there were a couple minor things that need addressing, all in all everything is looking good. On Thursday, we had a second walk through with the 2nd Electrician - J from Vision Living. I really can't recommend these guys enough as they have been so thorough with everything and ever so helpful. All the coloured cables are a sample of Vision's work.


While we had our walk through, the insulation was going in around us. Wow, what a difference 1 hour makes to the look of a place.




Gyprocking is scheduled to begin tomorrow (yes, even on a public holiday). We have our fingers crossed they have the last of the electrical fix ups sorted before the walls begin otherwise they might be making it more difficult on themselves.

We are so happy to see things progressing at a steady rate again!